I meant actually challenge.. and not just once in 20 years either.
£500m might see them do it once but I doubt it would be enough to over power the likes of Man City, Chelsea and Man Utd
I meant actually challenge.. and not just once in 20 years either.
£500m might see them do it once but I doubt it would be enough to over power the likes of Man City, Chelsea and Man Utd
Maybe not i suppose. If they kept 4/5 lads they have though... well.. no suppose not.
How much? A bil or so? Complete transformation?
Chelsea and Man City have both broken the billion barrier since being taken over haven't they? Man Utd broke that barrier as soon as the Glazer's bought them!
Yeah but chelsea is over 10 years.
Man city is over 5 manager?
Im not sure where utd are at since ferguson left.
I suppose catching them is one thing and continually staying there is another.
Any idea on timescale Jimmy?A redevelopment of the Anfield Road End which would see the capacity exceed 60,000 has already been agreed. [HASHTAG]#lfc[/HASHTAG] (Paul Joyce)
A redevelopment of the Anfield Road End which would see the capacity exceed 60,000 has already been agreed. [HASHTAG]#lfc[/HASHTAG] (Paul Joyce)
I looked around and found two rumours.
1. The same contractors who've just completed the main stand have been contracted for the anfield road end.
2. Owners are going to be at game this weekend.. and may make announcement.
So..... if Paul joyce was told that kind of aligns with ramping up expectation and hyping the thing.

We spoke about it last week mate on the 'Liv v Leics new stand' thread. mito posted the drawings from the Liverpool.gov site I linked from the time the plans were agreed, which was the same time the Main Stand plans were accepted.Any idea on timescale Jimmy?
http://www.liverpoolecho.co.uk/spor...l-transfer-rumours-juventus-interest-11862922
this one is fun.
dahoud linked to juve... his agent is already wokring o nthat bargain deal. I predict an lfc bid in january
Paul Joyce one of the better connected Jorno's with Liverpool states that the Anfield Road end Plans have been agreed and permission given at the time we submitted the Main Stand was...
I guess, FSG won't fund this one on their own, they'll most likely wait until we get part ownership with China sorted before we start on that, maybe in the next 3-5 years, will take capacity to over 60,000
The pitch has been reseeded, is there a difference between that and relaying it?You might be right. I would take a "break" next summer for the pitch to be totally relaid then crack on with it the following year personally.
I would hope they just do it. If we repay thier interest free loan in 2 years not 5.. well they should go do this
The pitch has been reseeded, is there a difference between that and relaying it?
You might be right. I would take a "break" next summer for the pitch to be totally relaid then crack on with it the following year personally.
I would hope they just do it. If we repay thier interest free loan in 2 years not 5.. well they should go do this