I thought the external facade was complete ages ago.
Seeing that makes me even more sure it won’t be ready until next season. I know they can open the stadium with bits unfinished but if they haven’t even done basics like that then there must be so many vital things left.
It was intended to open it without the 'veil' on at all and it's hardly a basic. Originally, it was to have been fitted this summer, as was the block paving, abseiling point, etc.. It's in no way integral to the structure of the stadium and only minorly related to its function in terms of regulating temperature etc. This is the one and only bit that I can actually claim 'ITK' about, as a member of my family won the heating/cooling contract for the stadium.
