DIY ****ers

  • Please bear with us on the new site integration and fixing any known bugs over the coming days. If you can not log in please try resetting your password and check your spam box. If you have tried these steps and are still struggling email [email protected] with your username/registered email address
  • Log in now to remove adverts - no adverts at all to registered members!
Finished the bedroom, bar a curtain rail and voile, which she can sort.

She gone up there with her manic cleaning head on and already smashed one of the bed side lamps to pieces.

Can hear her up there, ****ing things up.

Took me three whole full weekends and five IKEA trips, it's taken her 15 minutes to break something.
 
  • Like
Reactions: Commachio
Finished the bedroom, bar a curtain rail and voile, which she can sort.

She gone up there with her manic cleaning head on and already smashed one of the bed side lamps to pieces.

Can hear her up there, ****ing things up.

Took me three whole full weekends and five IKEA trips, it's taken her 15 minutes to break something.
I admire your stamina mate..
 
This thread should have been created three years ago, I'd have kept you all on the edge of your seat whilst doing the entire house! Not much left to report nowadays assist from the garden; waiting in posts and plinths to be delivered atm (only been 4wks so far)
 
This thread should have been created three years ago, I'd have kept you all on the edge of your seat whilst doing the entire house! Not much left to report nowadays assist from the garden; waiting in posts and plinths to be delivered atm (only been 4wks so far)
you did it all yourself, no help?
 
How did the wallpapering go ?
It didn't.

I didn't fancy attempting it by myself...So opted just to paint.....Which i'm ****ing sick of doing now....

I'm so bored of painting now,, up and down steps, lying on the floor cutting in etc.....
 
you did it all yourself, no help?

Legally couldn't fit boiler or do the re-wiring but did everything else. New bathroom, kitchen, utility room, knocked walls down, plastering, tiling, etc. All whilst working full time and the Mrs working evenings so had three kids to watch whilst at it <laugh>
 
Legally couldn't fit boiler or do the re-wiring but did everything else. New bathroom, kitchen, utility room, knocked walls down, plastering, tiling, etc. All whilst working full time and the Mrs working evenings so had three kids to watch whilst at it <laugh>
I'm very impressed mate....<applause>
 
  • Like
Reactions: Zanjinho
It didn't.

I didn't fancy attempting it by myself...So opted just to paint.....Which i'm ****ing sick of doing now....

I'm so bored of painting now,, up and down steps, lying on the floor cutting in etc.....
Yep I hate painting it drives me nuts !