That's very optimistic.Just in time for the A63 to be finished.
That's very optimistic.Just in time for the A63 to be finished.
But unfortunately not enough time for the Jocks Lodge A164 scheme to be completed.Just in time for the A63 to be finished.
But unfortunately not enough time for the Jocks Lodge A164 scheme to be completed.
But unfortunately not enough time for the Jocks Lodge A164 scheme to be completed.
That's just one part of it .will drypool even open by january?
marchYou must log in or register to see images
october:
You must log in or register to see images
im guessing with this speed, it might be finished in 2029
That's just one part of it .
Loads more going on towards Cottingham and Beverley .
By the way who was Jock
This was Jock's Lodge, it was originally a 'beerhouse' and was demolished to build the original bypass...
You must log in or register to see images
This was Jock's Lodge, it was originally a 'beerhouse' and was demolished to build the original bypass...
You must log in or register to see images
Blackbird Leys?I have a genius idea…..
You must log in or register to see images
Nah.Just a heads up. I should have stayed in Chelsea. Lol
You must log in or register to see images
Just a heads up. I should have stayed in Chelsea. Lol
You must log in or register to see images
The big muddyI’m on the train into Hull..what a view
You must log in or register to see images