Work is under way to get the pitch ready for next season.... http://www.bristolrovers.co.uk/cms_images/pitch-2014235-1627887_478x359.JPG
Additional drainage is currently being laid in the problem areas around the edge of the pitch. The surface will then be covered in top soil and over seeded, before work is done to improve aeration and relieve compaction. The work should be completed within the next two weeks, with the playing surface being ready for our pre-season game against Coventry on Friday, August 1st.
http://www.bristolrovers.co.uk/news/article/pitch-work-2014-1628451.aspx
You must log in or register to see images
Additional drainage is currently being laid in the problem areas around the edge of the pitch. The surface will then be covered in top soil and over seeded, before work is done to improve aeration and relieve compaction. The work should be completed within the next two weeks, with the playing surface being ready for our pre-season game against Coventry on Friday, August 1st.
http://www.bristolrovers.co.uk/news/article/pitch-work-2014-1628451.aspx