Gone ahead with my own build coming along nicely. Need to concrete some more feet in then rip it all apart and seal the cut ends.
Nicely done. Careful though, is that some asbest cement roof tile in the back left - you'll have Edith Shackleton on here calling a contamination unit round.
Yeah there was **** loads of it buried. Got a few more pieces I need to dig out then it’s all getting bagged.
Good, but give it a few months and you'll wish it was bigger. (innuendo optional) The views expressed in my posts are not necessarily mine.
Oooh, ooh, an excuse for an old Tom O'Conner joke. A man standing at a bus stop got into conversation with a navvy laying flagstones nearby. The man explained he was a precision engineer designing and building hi-spec equipment for the space project, and that he worked to a tolerances of less than 1,000th of a millimetre. "That'd be no good for us" says the navvy, "we've got to be cock on".
Sub floor panels cut to size and some more feet set this afternoon. Tomorrow it all comes apart for sealing. Really looking forward to that (there’s over 150 screws in it already)