http://www.constructionenquirer.com/2017/06/16/20-london-high-rises-with-grenfell-cladding-system/
http://www.rydon.co.uk/what-we-do/refurbishment/case-studies/refurbishment-case-studies/the-chalcots
....and if it couldn't get any worse it was all paid for by Labours PFI scheme....
Also, the company that supplied the cladding for the other tower blocks sell 3 different types of cladding, two of which are fire resistant.
"The cladding used is believed to have been sourced from US-based Reynobond.
The firm makes three types of panel: one with a flammable polyethylene core and two with more fire-resistant cores sandwiched between two thin aluminium skins."
Hopefully a swift check will be carried out and any tower block with these installed should be evacuated and taken down. Also any council that have approved this should hold their heads in shame, whatever political party they are with.
http://www.constructionenquirer.com/2017/06/16/20-london-high-rises-with-grenfell-cladding-system/
Last edited:

The people are not buying it and have woken up to the fact that the Tory cuts on everything are beginning to hurt and the BS they sprout is being questioned as only benefits the rich.......Tories out and keep the pressure on and force another G. E...in the autumn.....