All I hope that the contractor doing the cladding has used the materials specified and the meet current building standards.Criminal proceedings must follow after this cost cutting shambles and the government must act now and demolish all tower blocks above 10 stories as death traps and whoever sanctioned the cosmetic cladding should also face manslaughter charges......You should be safe in your flat in theory but cutting costs not putting sprinklers and automatic fire doors and using cheap plastic cladding put these tower blocks into death traps...heads must roll....
I'm amazed that there was no sprinkler system installed having gone through a 10m refurbishment.This is truly horrifying. I was at a London Council for meetings today, the feeling is that as it was a recent refurb the work will have conformed to Building regs but the issue is the regs are so weak! How can you have such a building with no sprinklers, fire alarm etc and just rely on individual apartments having a personal smoke alarm.
That's scandalous, another job we're doing in London right by Green Park, not a tall building but the fire mains riser is massive sprinklers everywhere.Apparently not Never!
Well sounds very iffy, so it's sounds to me that sub standard cladding was used. They will find out and someone will be going down for it.Take a look at @Justforaday2014's Tweet:You must log in or register to see media
Criminal proceedings must follow after this cost cutting shambles and the government must act now and demolish all tower blocks above 10 stories as death traps and whoever sanctioned the cosmetic cladding should also face manslaughter charges......You should be safe in your flat in theory but cutting costs not putting sprinklers and automatic fire doors and using cheap plastic cladding put these tower blocks into death traps...heads must roll....

Take a look at @Justforaday2014's Tweet:You must log in or register to see media

Pretty crass comments there , but I agree that who ever is culpable should be prosecuted .The contractor who has done the work in these Tower blocks are in the clear because the council and the fire brigade passed the cladding fit to use and inspected the job when done and passed it.....It was the resident committee who were not happy and said it will take a fire for them to listen......Heads must roll in the FB inspectors and those who approved the work. and the Tory party for the cuts to council funds that enabled the council to make cheap options....