You will wait at least 12 weeks for a a call and survey ,told yesterday and a good chance of a out of town installer On top of this a few want £250 up front towards the boiler Not much good if you a senior with a bust boiler in the middle of winter.
I wish I'd have gone for either of those Got an Ideal Logic which ain't bad but rather have gone the others
Not what I found to be fair. And it is a lot, lot less than you would pay anywhere else for a boiler. Luckily it was in summer. Less than 6 weeks from applying to installation. May have been lucky. Because of some extra pipe work that had to be done because of some of the old stuff not being up to modern requirements would have been about £2,400 in total from quotes from elsewhere. Cost me £323, of which part was for extras. No complaints here.
Don’t complain about a lot of things. Only idiots. Fertile ground on here. Present company excepted, naturally.